Repair and
Strengthening

NASHARTI TOWER
ZAMALEK

Large deformations in the cantilever slabs were observed due to lack of top reinforcement and the slabs needed to be strengthened.
The design, schematic and site supervision was performed with HILAL Consultants experienced engineers. This type of project needs high care and slow rate of work, with close supervision to get the best results.

Built-Up Area

----

Location

Zamalek, Cairo, Egypt

Number of Floors

----

Date

2015

Client

Mr. Samir ElNasharti

Scope of Work

Design and Site Supervision

GARDINIA EL-SHAMS P_2/18

The ground floor ceiling of this building was lacking in shear reinforcement of beams and the beams needed to be strengthened in shear. According to architectural aspects the width of beams was not desired to be increased. Carbon Fiber Reinforced Polymers (CFRP) were used as external shear reinforcement to minimize the increase in beam thickness. The beams needed to be smoothed and then the epoxy layer was applied and then the CFRP strips were applied and pressed against the concrete surface. The supervision of our experienced engineers was a must in such a new technique.

Built-Up Area

----

Location

6th of October, Egypt

Number of Floors

----

Date

2016

Client

Al-Shams Company

Scope of Work

Design and Site Supervision

NUNU FACTORY

The ground floor ceiling of the factory "NUNU" for textiles in Cairo was subjected to heavy water vapor. The lead to steel rust. The change in use of upper floor to heavy LL warehouse, needed urgent strengthening for the floor. A system of steel beams to support the concrete slab was chosen and mounted under design and supervsion of our engineers.

Built-Up Area

----

Location

Cairo , Egypt

Number of Floors

----

Date

2018-2019

Client

Mr. Nyar Nunu

Scope of Work

Structural Design and Site Supervision